2018/10/09 - Radiator Install
First up were the aluminum panels. They were easy and straightforward. I used the long rivets in a couple of locations. Other than that, the manual gives good instructions here.
Estimated time spent: 2 hours
First up were the aluminum panels. They were easy and straightforward. I used the long rivets in a couple of locations. Other than that, the manual gives good instructions here.
Estimated time spent: 2 hours